Skip to main content
Video Press Releases

Restriping Your Bank Lot? ADA Rules You Can't Skip

Published November 19, 2026

Avello's take

A routine bank parking lot restriping or repaving project can raise questions about ADA requirements. This video explains when that work becomes an alteration that requires upgraded accessible parking spaces. It covers how the scoping table applies to accessible and van-accessible parking in each lot. It also walks through space dimensions, slope, placement near the entrance, and signage. The item includes exceptions that may apply when physical constraints make full compliance infeasible.

For Hudson Valley property owners and managers planning this work, we see this as a useful starting point for understanding what the project may need to address. Restriping involves more than deciding where the lines go when ADA alteration requirements apply. A sensible next step is a review of the planned work alongside the lot’s accessible spaces, entrance location, slopes, and signs, with any physical constraints considered as part of that review.

https://avelloasphalt.com/blacktop-paving-construction-report/what-ada-parking-rules-apply-when-banks-and-credit-unions-in-east-fishkill-restripe-or-repave This video breaks down when a routine parking lot restriping or repaving project legally becomes an ADA alteration requiring upgraded accessible spaces. It explains the scoping table for calculating required accessible and van accessible spaces per lot, along with dimension, slope, and placement rules relative to the entrance. It also covers signage requirements and the exceptions available when physical constraints make full compliance infeasible.

Source: Avello Asphalt & Construction media distribution, November 19, 2026.

Mentioned in this video press release: Fishkill service area

Have a property like this?

Tell us what you're seeing. We'll walk the site, explain the options plainly, and give you a clear scope.