Skip to main content
Commercial · Municipal · Hudson Valley NY

Line Striping

ADA-compliant line striping, stencils, fire lanes, directional arrows, and pavement markings using waterborne or thermoplastic paint engineered for commercial wear. Avello treats line striping as risk and compliance work, not decoration.

  • Licensed & fully insured in NY
  • Free written scope & budget range
  • Commercial · Municipal · Industrial
Not ready to call?

Get a free Pavement Risk Snapshot

Answer a few questions about the property and get a prioritized repair-vs-resurface plan with a realistic budget range. No site visit, no obligation.

Free · 2 minFree Pavement Risk Snapshot

Avello's process

  1. Layout review against site plan and ADA requirements
  2. Pressure-blow the surface to remove dust and debris
  3. Chalk or string layout for stalls, lanes, and arrows
  4. Apply primer over fresh asphalt if needed
  5. Spray waterborne or thermoplastic paint at spec mil thickness
  6. Stencil ADA symbols, fire-lane lettering, and directional arrows
  7. Cure and reopen — typically 30–60 minutes for traffic
  8. Written scope with quantities, materials, and a realistic budget range you can hand to ownership, a board, or a finance director
  9. Pre-construction notice package with dates, affected areas, and access maps so tenants, staff, or residents are never surprised
  10. Post-work walkthrough with photo documentation and a punch list closed out before final invoicing

What you get

  • ADA-compliant stall layout with proper access aisles
  • Specified paint type (waterborne or thermoplastic)
  • Fire-lane and no-parking markings per local code
  • Directional arrows, stop bars, and crosswalks
  • Stencils for ADA, EV, reserved, and visitor stalls
  • Workmanship warranty
  • Photo-documented before-and-after record for your maintenance and liability file
  • A prioritized follow-up plan showing what should be scheduled next season and roughly what it will cost

Warning signs you need this work

  • Stripes faded below 50% visibility
  • Missing ADA symbols or access-aisle hatching
  • Fire-lane markings no longer legible
  • Stalls drifted out of square from repeated repaints
  • Tenant or fire-marshal complaint on file
  • Water standing on the pavement more than 24 hours after rain
  • Repairs made in the last two seasons that are already failing again

Ideal for

  • New pavement ready for first stripes
  • Lots with faded or non-compliant ADA layouts
  • Properties re-configuring stall counts or traffic flow
  • Sites needing fire-lane recertification
  • Schools and campuses with seasonal striping needs
  • Owners and managers who need a written, defensible scope rather than a one-line verbal number
  • Properties that must stay open and accessible while the work is completed

FAQ

Waterborne or thermoplastic?+

Waterborne is standard for parking lots — 1–3 year life, fast cure. Thermoplastic is used for crosswalks, fire lanes, and high-wear areas where 5–7 year life is needed.

How long until we can drive on it?+

Waterborne stripes are typically traffic-ready in 30–60 minutes. Thermoplastic cures in 5–15 minutes.

Will you re-layout, or follow the existing lines?+

Either. For ADA upgrades or stall-count changes, we re-layout. For maintenance repaints, we follow the existing layout.

Do you handle stencils for our brand?+

Yes — Avello cuts custom stencils for tenant logos, reserved-stall names, and EV markings.

Line Striping across the Hudson Valley

Avello provides line striping for commercial and municipal property owners across 359 New York towns and cities.

See all 359 service areas →