Milling and Paving
Cold-mill the existing surface to design depth, address base failures, and pave new hot mix to restored grades — the standard rehabilitation method for commercial and municipal pavement. Avello builds milling and paving from the subgrade up.
- Licensed & fully insured in NY
- Free written scope & budget range
- Commercial · Municipal · Industrial
Get a free Pavement Risk Snapshot
Answer a few questions about the property and get a prioritized repair-vs-resurface plan with a realistic budget range. No site visit, no obligation.
Free · 2 minFree Pavement Risk SnapshotAvello's process
- Verify existing depths with cores
- Mill the wear course to design depth (typically 1.5"–2")
- Saw-cut and patch base failures discovered during milling
- Adjust manholes, valves, and grates to final grade
- Apply tack coat to bond new mix to milled surface
- Pave NYSDOT-spec hot mix in single or two-lift sections
- Re-stripe to ADA-compliant layout
- Written scope with quantities, materials, and a realistic budget range you can hand to ownership, a board, or a finance director
- Pre-construction notice package with dates, affected areas, and access maps so tenants, staff, or residents are never surprised
- Post-work walkthrough with photo documentation and a punch list closed out before final invoicing
What you get
- Cold-milled surface to specified depth
- Adjusted utility castings flush to grade
- NYSDOT-spec hot-mix overlay with delivery tickets
- Compaction documentation on request
- Fresh ADA-compliant stripe layout
- Workmanship warranty
- Photo-documented before-and-after record for your maintenance and liability file
- A prioritized follow-up plan showing what should be scheduled next season and roughly what it will cost
Warning signs you need this work
- Surface alligator cracking with sound base below
- Rutting and shoving in wear course
- Faded markings and poor ride quality
- Manholes settled or sticking up from the surface
- Edge raveling along curbs and lane lines
- Water standing on the pavement more than 24 hours after rain
- Repairs made in the last two seasons that are already failing again
Ideal for
- Properties keeping existing grades, curbs, and door heights
- Lots needing structural repair without full reconstruction
- Municipal roads on a maintenance overlay cycle
- Sites with adequate base but failed surface course
- Owners and managers who need a written, defensible scope rather than a one-line verbal number
- Properties that must stay open and accessible while the work is completed
FAQ
Why mill instead of just overlaying?+
Milling keeps grades, drainage slopes, and door clearances intact. An overlay without milling creates trip lips and chases water back toward buildings.
What depth is standard?+
1.5"–2" for most commercial lots. Municipal roads may mill 2"–3" depending on the wearing-course spec.
What happens to the millings?+
Avello recycles millings into RAP (recycled asphalt pavement) used in future base courses.
Do you mill in winter?+
Milling can be done year-round; paving requires hot-mix plants which typically close mid-November to mid-April in NY.
Milling and Paving: illustrative project scenarios
Hypothetical town-level write-ups showing the scope, specifications, phasing and outcomes Avello builds into this work.
See all town-level project scenariosMilling and Paving across the Hudson Valley
Avello provides milling and paving for commercial and municipal property owners across 359 New York towns and cities.

