EV Charging Pad & Site Prep
Site prep, pads, conduit trenching, and bollard protection for EV charging installations — built to the spec your EV provider, electrician, and utility need. Avello treats ev charging pad & site prep as risk and compliance work, not decoration.
- Licensed & fully insured in NY
- Free written scope & budget range
- Commercial · Municipal · Industrial
Get a free Pavement Risk Snapshot
Answer a few questions about the property and get a prioritized repair-vs-resurface plan with a realistic budget range. No site visit, no obligation.
Free · 2 minFree Pavement Risk SnapshotAvello's process
- Coordinate with EV provider, electrical contractor, and utility
- Mark utilities and lay out pad, conduit, and bollard locations
- Saw-cut and excavate pad footprint and conduit trenches
- Install conduit and pull-boxes per electrical drawings
- Pour reinforced concrete pads sized for the charger model
- Backfill trenches, restore asphalt, and re-stripe EV stalls
- Install protective bollards around each unit
- Written scope with quantities, materials, and a realistic budget range you can hand to ownership, a board, or a finance director
- Pre-construction notice package with dates, affected areas, and access maps so tenants, staff, or residents are never surprised
- Post-work walkthrough with photo documentation and a punch list closed out before final invoicing
What you get
- Engineered concrete pads sized for the specified chargers
- Conduit and pull-boxes per electrical drawings
- Asphalt restoration over trenches
- Protective bollards installed
- ADA-accessible EV stall striping and signage
- Workmanship warranty
- Photo-documented before-and-after record for your maintenance and liability file
- A prioritized follow-up plan showing what should be scheduled next season and roughly what it will cost
Warning signs you need this work
- EV grant deadline approaching with no civil contractor lined up
- Charger order delivered but pad and conduit not ready
- Existing chargers without bollard protection (insurance concern)
- ADA-required EV stall not yet provided
- Water standing on the pavement more than 24 hours after rain
- Repairs made in the last two seasons that are already failing again
Ideal for
- Retail centers and big-box stores adding chargers
- Hotels and hospitality properties
- Workplaces adding employee EV stalls
- Municipal lots and park-and-rides
- Multifamily and HOA properties
- Owners and managers who need a written, defensible scope rather than a one-line verbal number
- Properties that must stay open and accessible while the work is completed
FAQ
Do you coordinate with our electrician?+
Yes. Avello phases excavation, conduit, and pour to fit the electrician's pull schedule.
What size pad do EV chargers need?+
Typical Level-2 pad is 3'×5'; DC fast-charger pads are 4'×6' to 5'×8' with deeper footings. We build to the manufacturer's spec sheet.
Are bollards required?+
Most manufacturers and insurance carriers now require front and side bollards. Avello installs Schedule 40 concrete-filled bollards as standard.
Do EV stalls need ADA compliance?+
Yes — new chargers must include at least one accessible stall with proper access aisle and signage.
EV Charging Pad & Site Prep across the Hudson Valley
Avello provides ev charging pad & site prep for commercial and municipal property owners across 359 New York towns and cities.