EV Charging Pad & Site Prep

Site prep, pads, conduit trenching, and bollard protection for EV charging installations — built to the spec your EV provider, electrician, and utility need. Avello treats ev charging pad & site prep as risk and compliance work, not decoration.

  • Licensed & fully insured in NY
  • Free written scope & budget range
  • Commercial · Municipal · Industrial
Not ready to call?

Get a free Pavement Risk Snapshot

Answer a few questions about the property and get a prioritized repair-vs-resurface plan with a realistic budget range. No site visit, no obligation.

Free · 2 minFree Pavement Risk Snapshot

Avello's process

  1. Coordinate with EV provider, electrical contractor, and utility
  2. Mark utilities and lay out pad, conduit, and bollard locations
  3. Saw-cut and excavate pad footprint and conduit trenches
  4. Install conduit and pull-boxes per electrical drawings
  5. Pour reinforced concrete pads sized for the charger model
  6. Backfill trenches, restore asphalt, and re-stripe EV stalls
  7. Install protective bollards around each unit
  8. Written scope with quantities, materials, and a realistic budget range you can hand to ownership, a board, or a finance director
  9. Pre-construction notice package with dates, affected areas, and access maps so tenants, staff, or residents are never surprised
  10. Post-work walkthrough with photo documentation and a punch list closed out before final invoicing

What you get

  • Engineered concrete pads sized for the specified chargers
  • Conduit and pull-boxes per electrical drawings
  • Asphalt restoration over trenches
  • Protective bollards installed
  • ADA-accessible EV stall striping and signage
  • Workmanship warranty
  • Photo-documented before-and-after record for your maintenance and liability file
  • A prioritized follow-up plan showing what should be scheduled next season and roughly what it will cost

Warning signs you need this work

  • EV grant deadline approaching with no civil contractor lined up
  • Charger order delivered but pad and conduit not ready
  • Existing chargers without bollard protection (insurance concern)
  • ADA-required EV stall not yet provided
  • Water standing on the pavement more than 24 hours after rain
  • Repairs made in the last two seasons that are already failing again

Ideal for

  • Retail centers and big-box stores adding chargers
  • Hotels and hospitality properties
  • Workplaces adding employee EV stalls
  • Municipal lots and park-and-rides
  • Multifamily and HOA properties
  • Owners and managers who need a written, defensible scope rather than a one-line verbal number
  • Properties that must stay open and accessible while the work is completed

FAQ

Do you coordinate with our electrician?+

Yes. Avello phases excavation, conduit, and pour to fit the electrician's pull schedule.

What size pad do EV chargers need?+

Typical Level-2 pad is 3'×5'; DC fast-charger pads are 4'×6' to 5'×8' with deeper footings. We build to the manufacturer's spec sheet.

Are bollards required?+

Most manufacturers and insurance carriers now require front and side bollards. Avello installs Schedule 40 concrete-filled bollards as standard.

Do EV stalls need ADA compliance?+

Yes — new chargers must include at least one accessible stall with proper access aisle and signage.

EV Charging Pad & Site Prep across the Hudson Valley

Avello provides ev charging pad & site prep for commercial and municipal property owners across 359 New York towns and cities.